Well Completion and Management
Select Other "city & date"
Well Completion and Management Course
Introduction:
This 5-day course emphasis the role of the Well, as part of the Integrated Production System for a Hydrocarbon Asset. Well Completion design concepts and the technical selection criteria for the main completion components are reviewed in detail. The last two days of the Courses is spent on the completed well’s Flow behavior and the key parameters affecting Well Performance/Productivity. Group exercises on Completion and Performance augment the learning process. The course also highlights the Operating Company’s viewpoint in the area of Well Completion and Well Production Management.
Course Objectives:
By the end of the course, participants should be to: State how Well Completion fits into the E&P Activity; Recall and discuss hydrocarbon exploitation considerations for well productivity and completion design; Describe the main parameters that influences Well Performance and Productivity; Describe the factors that influence the selection and design of the completion string and components; Carry out a completion design and explain how it will be run in the well. Also, at the end of the course, attendants will understand the criteria for completion selection, the functions of typical completion equipment and accessories.
Who Should Attend?
Geo-scientists, Engineers and Managers (in Drilling, Well Intervention/Services, Reservoir Engineering, Production Operations, Marketing/Sales etc.), whose jobs require them to interface with Completion Engineers, Production Technologists, Well Production Operations Engineers, and Well Maintenance/Servicing Engineers who wish to enhance their current job effectiveness, through more knowledge on Well Completion and Performance, than that attained from their own "core" discipline training and exposure.
Course Outlines:
- Reservoir -Integrated Production System, Well Completion Methods, Classification of Reservoir Based on the Fluids in the Reservoir, Classification of Reservoir Based on Driving Mechanisms, Engineering Aspects, and Exploitation.
- Initial quiz.
- Wellheads.
- Casing suspension.
- Tubing selection.
- Tubing design.
- Flow in Porous Media, Well Deliverability (exercises), Completions Effects, Flow in Pipes, Choke Performance, Systems Analysis
- Tubing connections.
- Upper completion accessories.
- Safety valves.
- Packers.
- Tubing Design, Completion String Design, Exercise Combination Casing String Design, Tubing Loads and Movement, Tubular Connections.
- Artificial Lift.
- Multilaterals.
- Sand Control.
- CH sand exclusion completions
- Completion Equipment, Casing and Casing Suspension, Wellheads, Tubing Selection, Tubing Connection, Packers, Wellsite Operations.
- Fracturing.
- Intelligent completions.
- Perforations
- Subsea Completions, Present Systems, Applications, Requirement Designs and Types, Controls, Flowline Connections, ROVs.
- Stress analysis in tubulars.