Completions and Workover
Select Other "city & date"
Completions and Workover Course
Introduction:
The course focuses on the practical applications of various techniques and methodologies in well completion from the selection of completion type, perforating strategies, fluid selection, and installation of production heads. The training relates these elements to the various subsurface problems that are encountered in the field including various reservoir properties (sandstones and carbonates, subsurface chemical environment, etc). The delegates will perform one major completion design project which they will have to complete and present within the week. Moreover, well control and well work over techniques will also be covered to complement the insurance of well longevity of the installation. This course provides a good link to how the techniques in well completion would ensure better well performance and production later in the life of the well.
Course Objectives:
- IDENTIFY & UNDERSTAND the parameters that influence selection and design of completion components
- GAIN practical methods in well completion from casing, cementing, perforating, packing, and installation of production tree
- MANAGE well environments with extreme chemical, temperature, and pressure characteristics
- BRIDGE the importance of well design in relation to the ability to carry out well interventions
- EXPLORE new technological developments in well completions and walkovers
- PLAN an appropriate intervention and work over strategy to maintain or increase field production
Who Should Attend?
The course is designed for, but not limited to Completion Engineers, Workover Engineers, Production Engineers, and those who are involved with well completions, walkovers, well interventions, and production.
- Completion Engineer
- Workover Engineer
- Well Services / Intervention Engineer
- Production Engineer
- Drilling Engineer
- Well Site Engineer
Course Outlines:
Well Performance
- Safety Alert
- Introduction to Completion Design
- Starter Quiz & Review
- Introduction to Completion Design Project
- Reservoir Completion: Inflow Performance
- Reservoir Completion: Perforations
- Reservoir Completion: Well Stimulation / Hydraulic Fracturing
- Reservoir Completion: Sand Control
- Day Two: Well Completion Equipment’s, Components, & Installation
- Artificial Lift Methods
- Tubing Stress Analysis
- Completion Components (Features & Usage)
- Practical Exercise: Completion design project (work out this project in a group) (CONTINUE)
Modern Well Completion & Intro to Well Intervention
- Completion Operation Base Preparation
- Rig Preparation and Completion Installation Process
- Emerging Techniques
- Practical Exercise: Completion design project (CONTINUE)
Well control & Well Work over
- Well Control
- Work over Operations
- Work over Feasibility Studies
- Group presentation / General Review of the Well completion Design Project
Practical cases
